To: HONORABLE MAYOR AND From: Carl
W. Mosher
CITY COUNCIL
Subject: SEE BELOW Date: 10-1-03
Subject: FOURTH AMENDMENT TO THE AGREEMENT WITH THE
CITY OF SANTA CLARA
Approval of the fourth amendment to the agreement for
engineering construction and construction services by and between City of Santa
Clara and the City of San Jose for implementation of portions of the South Bay
Water Recycling Program, increasing the amount of compensation by $2,700,000
for a total agreement amount not to exceed $27,600,000 for recycled water
projects within the City of Santa Clara.
BACKGROUND
Between 1995 and 1997, a total of $16 million was
appropriated for construction by the City of Santa of Clara of approximately
eleven miles of recycled water pipelines (Phase 1) within the City of Santa
Clara. In February 2000, with approval
of the third amendment to the “Agreement for
Engineering, Construction and Construction Services by and between City of
Santa Clara and the City of San Jose for Implementation of Portions of the
South Bay Water Recycling Program,” an additional $8.9 million was authorized
for construction of two new pipeline segments
with a total length of about 6.1 miles (SC1
and SC3), and three additional segments with a total length of about 5.4 miles
(SC-2, SC-4 and SC-5) were authorized, “subject to
future appropriation of funds,” bringing the total contract not to exceed
amount of $30 million.
In December 2001,
staff compared the relative costs and benefits of new opportunities to extend
the recycled water system in Santa Clara to determine the best project
alternatives. The results of that
analysis are implemented in the proposed fourth amendment which substitutes for
the approved 2.7 mile pipeline serving various business parks (SC-3), a
2.3-mile extension to serve Santa Clara Central Park and four schools
(SC-6). In addition, the fourth
amendment authorizes construction of a reliability connector between the Santa Clara
and San Jose systems (revised SC-5) and an extension to serve various customers
in northern Santa Clara (Juliette Lane).
In summary, whereas the third amendment authorized construction of 6.1 miles of pipeline, at a cost not to exceed $8.9
million, the fourth amendment will authorize construction of about 6.9
miles of pipe at a total cost not to exceed $11.6 million. Construction of the two remaining projects
(SC-2 and SC-4) will be deferred subject to future appropriation and the total
not to exceed amount of the agreement will remain unchanged at $30
million. The fourth amendment also
extends the term of the agreement until June 30, 2008 to allow for the design
and construction of the specified pipelines.
The SC-6
alignment includes approximately 1,555 meters (m) or 5,100 linear feet (LF) of
406-mm (16-in) diameter pipe; 1,320 m (4,330 LF) of 305-mm (12-in) diameter
pipe; and 762 m (2,500 LF) of 203 mm (8-in) diameter recycled water pipeline to
serve Central Park, Santa Clara Swim Center, Milliken Elementary School, St.
Justin’s School, Central Library, Santa Clara High School, Haman School and
Steve Carli Park. The pipeline will
connect to the existing 406 mm (16-in) diameter pipeline located on Homestead Road
adjacent to Wilson Adult Education. SC-6 will include a 61 m (200 LF) crossing beneath San Tomas
Expressway and an 18 m (60 LF) crossing beneath Saratoga Creek at Kiely
Boulevard.
SC-5, the San
Jose-Santa Clara Connector, will increase reliability of the South Bay Water
Recycling (SBWR) system by looping the Santa Clara and San Jose pipeline
networks. The Santa Clara segment SC-5
includes approximately 1,200 m (4,300 LF) of 508 mm (20-in) diameter recycled
water pipeline and will connect to the existing 610 mm (24-in) diameter
pipeline located at Grant Street. The
original SC-5 alignment was realigned to prevent conflicts with revised
regional transportation plans (i.e. BART service to Silicon Valley). The revised SC-5 pipeline will proceed from
the intersection of Grant and Reed Street, along Reed Street and under 46 m
(150 LF) of UPRR crossing to De La Cruz to Coleman Avenue, along Coleman Avenue
past Brokow Road to the San Jose city limits where it will connect with the 508
mm (20-inch) San Jose line.
The Juliette Lane pipeline includes approximately 1,800 LF
of pipeline to serve irrigation customers, including Intel, located along
Juliette Lane.
During the summer and fall of 2000 the cities of San Jose,
Santa Clara, and Milpitas held public meetings on the local use of recycled
water. Also, representatives of various
stakeholder groups (e.g. Sierra Club, League of Women Voters, Silicon Valley
Chamber of Commerce) met regularly in 1998 and 1999 to create the present plans
for extension of the recycled water system.
In addition, staff members from the cities of San Jose (San
Jose Municipal Water), Santa Clara and Milpitas, and San Jose Water Company
have attended monthly meetings to review South Bay
Water Recycling planning and operations.
This memo has been coordinated with the City Attorney’s
office, Risk Management, and the City of Santa Clara. This memo is scheduled to be heard at the October 9, 2003
Treatment Plant Advisory Committee (TPAC) meeting.
1.
AMOUNT OF RECOMMENDATION: $2,700,000
2.
COST OF PROJECT:
Project Delivery
Construction
TOTAL $27,600,000
3. SOURCE
OF FUNDING: 512 – San Jose/Santa Clara Treatment Plant Capital Fund
In accordance with the Mayor’s prescribed budget strategy,
the tasks under this agreement will focus on the protection of a vital core
service, emphasizing expenditures that improve reliability of the SBWR system.
|
Fund # |
Appn # |
Appn.
Name |
RC
# |
Total Appn.* |
Additional
Amount Authorized by Amendment |
2003-2004 Proposed Capital Budget |
Last Budget Action (Date,
Ord. No.) |
|
512 |
6589 |
Revised
SBAP –SBWR Extension |
062873 |
37,220,000 |
$2,700,000 |
178 |
|
* Includes total amount approved in the
2003-2004 Adopted Capital Budget.
CARL W. MOSHER
Director, Environmental Services
Department