Click to Home
Go To Search
Urban Forest
San Jose Home
Short Term Permit
Short Term (1 year) Industrial Wastewater Discharge Permit
Required by temporary locations needing a sanitary sewer connection; valid for a maximum of one year.

Examples of projects that may require a short term discharge permit include:
  • Underground storage tank or gas station remediation
  • Water line or oil pipelines hydrostatic testing
  • Groundwater or stormwater remediation from contaminated sites
  • Dewatering from construction site to the sanitary sewer
  • Ponds, commercial pools, and other commercial manhole connections

To apply, download and complete a Short Term Wastewater Discharge Permit Application.