Click to Home
Go To Search
Planning Building and Code Enforcement
San Jose Home
Regional Wastewater Facility Master Plan
File No. PP11-043
SCH # 201105274
Resolution No. 76858 on 11/19/2013

The San José-Santa Clara Regional Wastewater Facility Master Plan project includes a number of technical improvements to the San José-Santa Clara Regional Wastewater Facility and changes to the land use of the Plant’s 2,684 acres. The technical improvements include the Plant’s wastewater treatment operations, including changing the 700-acre biosolids dewatering and drying operations to a mechanical operation requiring less than 160 acres. The land uses include future areas for WPCP and recycled water operations (629 acres), new roads and economic development areas (387 acres), flood control protection and environmental habitat restoration benefiting endangered and threatened species (1,190 acres), recreational facilities such as parks (42 acres) and trails (16 miles), and other uses (436 acres). 

Project Documents


File No. 15-120 San Jose-Santa Clara Regional Wastewater Facility Construction-Enabling Improvements