Charcot Avenue Extension Project
File No. PP18-044
The project proposes to extend Charcot Avenue from its eastern boundary at Paragon Drive, over I-880, to Oakland Road in the North San José area.  This is an approximately 0.6-miles long 2-lane extension, and includes an overcrossing of O’Toole Avenue and I-880 that would be approximately 720 feet in length.  Sidewalks and Class IV bikeways are proposed along the extension.  In addition, the proposed project includes intersection improvements at Charcot Avenue/Paragon Drive, Charcot Avenue/O’Toole Avenue, Charcot Avenue/Silk Wood Lane, and Charcot Avenue/Oakland Road. Along the proposed Charcot Avenue extension the project would require the installation of retaining walls and relocation of existing utilities as necessary, require additional right-of-way from a number of parcels and easement located along the proposed alignment.

EIR Notice of Preparation Comment Period
April 30, 2018 to May 31, 2018

EIR Scoping Meetings


An EIR Scoping meeting will be held on Thursday, May 17, 2018 from 6:00 p.m. to 8:00 p.m. at the Berryessa Branch Library, 3355 Noble Avenue, San Jose, CA 95132.

A second EIR Scoping meeting will be held on Monday, May 21, 2018 from 5:30 p.m. to 7:30 p.m. at the Orchard School Community Multi-Purpose Room, at 921 Fox Lane, San Jose, CA  95131.

Project Documents

Environmental Project Supervisor
Meenaxi R. Panakkal, AICP
(408) 535-7895


Jenny Nusbaum
(408) 535-7872