![]()
Planning Home | Services Overview | Hearings | General Plan | Zoning Ordinance | Development Review Environmental Review Links | SJ Home Page | Contact Us |
Public Hearings: 2004 Hearing Agendas
Planning Commission Agenda
Synopsis
Wednesday, March 24, 2004
![]()
6:00 p.m. Meeting
1. ROLL CALL
ALL WERE PRESENT, EXCEPT CAMPOS AND JAMES.
2. DEFERRALS
Any item scheduled for hearing this evening for which deferral is being requested
will be taken out of order to be heard first on the matter of deferral. A list of
Staff-recommended deferrals is available on the Press Table. If you want to change any of
the deferral dates recommended, or speak to the question of deferring these or any other
items, you should say so at this time.
DEFERRED TO 4-14-04. 3. CONSENT CALENDAR Notice to Public: The consent calendar items are considered
to be routine and will be adopted by one motion. There will be no separate discussion of
these items unless a request is made by a member of the Planning Commission, staff or the
public to have an item removed from the consent calendar and considered separately. If
anyone in the audience wishes to speak on one of these items, please come to the podium at
this time.
APPROVED
WITH CONDITIONS (5-0-2; JAMES AND CAMPOS ABSENT). COMMISSIONER ZITO ASKED STAFF FOR CLARIFICATION ON WHAT WAS
INCLUDED IN THE ADDITION. STAFF
INDICATED THAT THE ADDITION WOULD INCLUDE A BATHROOM, STAIRWELL AND
EXPANSION OF TWO EXISTING ROOMS TO MEET THE SQUARE FOOTAGE REQUIREMENT FOR A
SRO LIVING UNIT (150 SQUARE FEET). APPROVED
(5-0-2; JAMES AND CAMPOS ABSENT). COMMISSIONER
ZITO ASKED STAFF WHETHER ANY TRAFFIC IMPACT ANALYSIS WAS DONE FOR THIS
PROJECT. STAFF RESPONDED BY
INDICATING THAT THE BUILDING WAS BUILT AS A WAREHOUSE AND THIS PERMIT WAS
SIMPLY REINSTATING THAT PREVIOUS USE WHICH WAS ANALYZED THROUGH A PREVIOUS
PERMIT.
1. CP03-057. Conditional Use Permit to
allow a corporation yard, construction of 2,312 square-foot office building and associated
outdoor uses.
APPROVED WITH CONDITIONS (5-0-2; JAMES AND CAMPOS ABSENT). THE APPLICANT'S REPRESENTATIVE DISCUSSED A CONCERN RELATED TO THE CONDITION REQUIRING A 10-FOOT SETBACK FROM THE RESIDENTIAL PROPERTY. THE COMMISSION ASKED STAFF TO RESPOND TO THE APPLICANTS ISSUE. STAFF INDICATED THAT THE REQUIRED SETBACK IS 25 FEET; HOWEVER, AN EXCEPTION DOWN TO 10 FEET WOULD BE ACCEPTABLE WITH APPROPRIATE LANDSCAPING AND TREES TO PROVIDE ADEQUATE BUFFERING BETWEEN THE INDUSTRIAL AND RESIDENTIAL USE.
2. V03-009. Development Variance to reduce the side setback requirements of the HI Heavy Industrial Zoning District from 25 to 5 feet adjacent to residential uses and the front setback from 15 feet to 0 feet.
WITHDRAWN.
The following items are considered individually.
4. PUBLIC HEARINGS
APPROVED
WITH CONDITIONS (5-0-2; JAMES AND CAMPOS ABSENT). COMMISSIONER ZITO INDICATED THAT HE HAD LISTENED TO THE TAPE
OF THE PREVIOUS HEARING ON THIS ITEM. COMMISSIONER
ZAMORA ASKED WHETHER A POLICE REPORT HAD BEEN RECEIVED AS REQUESTED DURING
THE PREVIOUS MEETING. REDEVELOPMENT
STAFF INDICATED THAT SHE HAD DISTRIBUTED A COPY OF THE E-MAIL RECEIVED FROM
THE POLICE DETAILING THEIR EXPERIENCE WITH THE EVENTS LAST YEAR.
DEPUTY CITY ATTORNEY RENEE GURZA INTERJECTED THAT ALTHOUGH THE
RESPONSE FROM THE POLICE IS NOT IN A FORMAL MEMO FORM, IT CLEARLY INCLUDED
THE INFORMATION THAT WAS REQUESTED BY THE COMMISSION.
COMMISSIONER ZITO ASKED SOME QUESTIONS OF THE APPLICANT INCLUDING
WHETHER THERE WAS A NEED TO HAVE THE EVENTS ON THURSDAY RATHER THAN FRIDAY?
THE APPLICANT INDICATED THAT THE PURPOSE OF THE THURSDAYS WAS TO
BUILD ON THE MUSIC IN THE PARK SERIES.
COMMISSIONER ZITO THEN MOVED TO APPROVE THE CUP
PER STAFF'S RECOMMENDATION WITH THE CONDITIONS THAT THERE BE A 3 YEAR
TERM, A 1 YEAR COMPLIANCE REVIEW, AND THE TOTAL NUMBER OF EVENTS BE LIMITED
TO 16. THERE WAS A SECOND AND
THE COMMISSION VOTED 4-1-2 WITH PLATTEN OPPOSED AND JAMES AND CAMPOS ABSENT.
COMMISSION PLATTED INDICATED THAT HIS VOTE FOR OPPOSITION WAS DUE TO
HIM BEING IN SUPPORT OF STAFF'S ORIGINAL RECOMMENDATION WITH OUT THE
LIMITATIONS. APPROVED
(5-0-2; JAMES AND CAMPOS ABSENT). COMMISSIONER
ZITO ASKED SOME QUESTIONS RELATIVE TO THE WALL HEIGHT AT THE REAR OF THE
PROPERTY. STAFF CLARIFIED THE NOISE IMPACT ASSOCIATED WITH THE USE AND THE
JUSTIFICATION OF A 7-FOOT HIGH WALL ALONG THE LENGTH OF THE PROPERTY VS. A
9-FOOT WALL FOR SMALL PORTION DROPPING DOWN TO A 7 FOOT WALL. WITHDRAWN.
5. PETITIONS AND COMMUNICATIONS
1. Responding to statements made or questions posed by members of the public; or
2. Requesting staff to report back on a matter at a subsequent meeting; or
3. Directing staff to place the item on a future agenda.
NO REPORT GIVEN.
DISTRIBUTED DA-BEA and PDC04-00 3-24-04. PLANNED DEVELOPMENT REZONING AND A DEVELOPMENT AGREEMENT BETWEEN CSJ AND BEA SYSTEMS, INC. TO INCREASE THE ALLOWED/PERMITTED SQUARE FOOTAGE ON THE SITE TO A TOTAL OF 2,800,000 SQUARE-FEET OF R & D/office uses through the allocation of floor area credits from the city's pool of transferable floor area to 41-acre site on the west side of north first street on both sides of component drive. council DISTRICT 4.
6. REFERRALS FROM CITY COUNCIL, BOARDS, COMMISSIONS OR OTHER AGENCIES
NO REPORT GIVEN.
7. GOOD AND WELFARE
Report from City Council
NO REPORT GIVEN.
Commissioners' reports from Committees:
Norman Y. Mineta San Jose International Airport Curfew Monitoring Committee (Dhillon and James).
NO REPORT GIVEN.
Coyote Valley Specific Plan (Platten)
COMMISSIONER PLATTEN COMMENTED ON THE SUCCESSFUL COMMUNITY WORKSHOP AND BUS TOUR HELD ON SATURDAY, MARCH 13TH IN COYOTE.
NO CHANGES.
8. ADJOURNMENT