All
Portland cement concrete, grout, and mortar specimens
are sampled, cured, and tested strictly according
to ASTM, ACI and Caltrans specifications.
Samples are placed in our fog room within 24 hours
of casting. They are stored in this temperature-controlled
environment throughout the curing period, typically
for 28 days.
After the specified curing period, the concrete
samples are tested and the results are promptly
transmitted to our client.
The
MTL provides the following services to its clients:
|