| PW Development Manual |
|
Information |
| Traffic Impact Analysis Handbook |
|
Volume I / Volume II |
| |
|
|
| PW Fees for Review of Planning Permits |
Review Fees |
|
| |
|
|
| Parkland Fees for Residential Projects |
|
PRNS Website |
| Sewer Fees |
Sewer Fees |
Information |
| |
|
|
| Encroachment Permits |
|
|
| New Driveway / Sidewalk Permit |
Fee Schedule |
Instructions / Application |
| Permit to Repair Existing Driveway / Sidewalk |
|
Dept. of Transportation
(408) 277-4373 |
| Sanitary Sewer Lateral Permit |
Fee Schedule |
Instructions / Application / Cleanout Detail |
| Revocable Encroachment Permit |
Fee Schedule |
Instructions / Application |
| Private Utility (Joint Trench) Permit |
Fee Schedule |
Instructions / Application |
| Public Utility Permit for Public Utility Companies (permits issued to AT&T, PG&E, Comcast, San Jose Water, Great Oaks Water, etc.) |
|
Utilities Section
(408) 975-7455 |
| Inter-Agency Encroachment Permit for other Governmental Agencies (permits issued to Caltrans, VTA, SCVWD, County of Santa Clara, etc.) |
|
Utilities Section
(408) 975-7455 |
| CD (Surety) Requirements For Public Works Permits |
N/A |
Information |
| Insurance Requirements For Working In Public ROW |
N/A |
Information |
| List of City streets classified as Arterial for fee calculation purposes |
N/A |
Information |
| |
|
|
| Traffic Control Requirements For Public Works Permits |
N/A |
Information |
| DOT Tow-Away Permit (Required when closing parking lane on City Streets) |
See Application |
Application |
| DOT Downtown Lane Closure Request Form (Required when closing lanes in the Downtown Area) |
See Application |
Application |
| |
|
|
| |
|
|
| Grading and Geology |
|
|
| Grading Permit |
Fee Schedule |
Instructions
/ Application / Submittal Checklist |
| Sample Grading Plans from our records of approved projects |
|
Sample Plans |
| Grading Plan CAD Coversheet (AutoCAD file of coversheet containing standard notes and details for grading plans) |
|
AutoCAD File / PDF File |
| Erosion/Sediment Control Plan |
Fee Schedule |
Fee Criteria / Standard Notes |
| Erosion Control Plan CAD Coversheet (AutoCAD file of coversheet containing standard notes for erosion plans) |
|
AutoCAD File / PDF File |
| Shoring Review (Required when grading or excavating activities require construction shoring) |
|
Instructions |
| Hydrant Water Use Permit (Required when using hydrant water for grading and/or construction) |
Fee Schedule |
Application |
| DOT Haul Route Permit (Required for grading projects importing or exporting more than 10,000 CY) |
|
Application |
| Geologic Hazard Clearance |
Fee Schedule |
Instructions
/ Application |
| PBCE Geologic Testing Application (Required to ensure Geologic Testing is in compliance with Environmental requirements) |
|
Application |
| |
|
|
| Mapping
and Vacations |
|
|
| Tract / Final Map |
Fee
Schedule |
Application |
| Parcel Map |
Fee
Schedule |
Instructions
/ Application |
| Sample Parcel and Tract maps from our records of approved projects |
|
Sample Maps |
| Technical review checklist which must be filled out and submitted with application for Parcel Map or Tract Map |
|
Submittal Checklist |
| Sample Statements for Parcel and Tract Maps |
|
Information |
| Monument Bond Release Form |
|
Application |
| Street & Easement Vacation / Abandonment |
Fee Schedule |
Instructions
/ Application |
| |
|
|
| Street Improvements Construction |
|
|
| |
|
|
| Public Street Improvement Plan |
Fee Schedule |
Instructions
/ Application |
| Sample Public Street Plans from our records of approved projects |
|
Sample Plans |
| Technical review checklist which must be filled out and submitted with application |
|
Submittal Checklist |
| Engineer's Estimate using standard City unit prices which must be filled out and submitted with application |
|
Engineer's Estimate |
| CAD Coversheet (AutoCAD file of coversheet containing standard notes and details for public improvement plans) |
|
AutoCAD File / PDF File |
| Sample Construction Agreement and Bonds |
|
Construction Agreement |
| Sample Subdivision Improvement Agreement and Bonds |
|
Subdivision Agreement |
| |
|
|
| Public Street Landscaping |
|
|
| Guidelines for the Planning, Design and Construction of City Streetscape Projects |
|
Guidelines / Details |
| Technical review checklist which must be filled out and submitted if public street landscaping is proposed as part of the project |
|
Initial Submittal Checklist
|
| Technical review checklist to be submitted with second round of Landscape plan check |
|
Second Submittal Checklist |
| |
|
|
| Traffic Signal Construction |
|
Instructions |
| Technical review checklist which must be filled out and submitted if traffic signal construction is proposed as part of the project |
|
Initial Submittal Checklist |
| Technical review checklist to be submitted with second round of Traffic Signal plan check |
|
Second Submittal Checklist |
| Guidelines for the placement of Traffic Signal Heads |
|
Guidelines |
| Design Notes to be incorporated into Traffic Signal Plan |
|
Design Notes |
| CAD file for standard Traffic Signal plan sheets |
|
AutoCAD File / PDF File |
| |
|
|
| Private Street Plan |
Fee Schedule |
Application / Standard Notes |
| Sample Private Street Plans from our records of approved projects |
|
Sample Plans |
| Technical review checklist which must be filled out and submitted with application |
|
Submittal Checklist |
| Engineer's Estimate using standard City unit prices which must be filled out and submitted with application |
|
Engineer's Estimate |
| CAD Coversheet (AutoCAD file of coversheet containing standard notes and details for private street plans) |
|
AutoCAD File / PDF File |