H25-035 and ER25-206 Montague Point Industrial Project

FILE NOS: H25-035 and ER25-206

The proposed project would result in the demolition of all existing buildings and construction of three new speculative industrial warehouse buildings. Building 1 would be located on the southeast corner of Montague Expressway and Zanker Road, Building 2 would be located centrally on the project site to the right of Building 1, and Building 3 would be located on the western corner of East Plumeria Drive and Montague Expressway intersection. The proposed project would construct a total of approximately 359,501 square feet of warehouse area and approximately 78,000 square feet of office space, for a total of approximately 437,501 square feet. The proposed project buildings would cover approximately 39 percent of the total project site. Additionally, the proposed project would connect to the existing water, wastewater, and stormwater drainage facilities within Junction Avenue.

LOCATION

3050 Zanker Road, 2840–2880 Junction Avenue, and 411 East Plumeria Drive

ASSESSOR'S PARCEL NUMBER

101-31-001, 101-31-002, 101-31-003, 101-31-004, and
101-31-005

CIRCULATION

Scoping Period: February 2, 2026 to March 5, 2026

PROJECT DOCUMENTS

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Windows Media Player Download Windows Media Player Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer

SCOPING MEETING

February 12, 2026 at 6:00PM on Zoom. See Notice of Preparation for details. 

ENVIRONMENTAL PROJECT MANAGER

Charlotte Yuen
408-535-5658
Charlotte.Yuen@sanjoseca.gov