City of San José
Home MenuPopular Searches
Terraine Mixed-Use Project
FILE NOS: sp21-045 & er21-312
The project consists of a Special Use Permit to develop an approximately 1.57-acre vacant lot over two phases. Phase I of the project would consist of the construction of a 17-story, 345-unit residential tower and a nine-level parking tower on a shared podium. The podium would cover the entire site and would include one below-grade level and one at-grade level of parking. The below-grade level would have a depth of approximately 20 feet. The podium would contain parking for vehicles and bicycles, loading areas, mechanical rooms, and lobbies. The podium would also include up to 11,777 square feet of ground floor retail space. A landscaped/open space area would be located between the residential tower and parking tower and on the ground floor of the podium. Phase II of the project would consist of the conversion of the parking tower into an office building with approximately 210,328 square feet of office space.
LOCATION
Southwest Corner of Bassett Street and Terraine Street in San José
ASSESSOR'S PARCEL NUMBER
259-24-020, 259-24-040, and 259-24-041
PROJECT DOCUMENTS
pUBLIC HEARING
The project will be heard at a Director’s Hearing on March 27, 2024 at 9:00 AM. The hearing documents and meeting link will be made available here closer to the hearing date: https://www.sanjoseca.gov/your-government/departments-offices/planning-building-code-enforcement/planning-division/commissions-hearings-and-developers-roundtable/planning-director-hearings/planning-director-s-hearing-agendas-minutes
ENVIRONMENTAL PROJECT MANAGER
Nhu Nguyen
408-535-6894
Nhu.Nguyen@sanjoseca.gov
