RWF Construction-Enabling Improvements

File No. PP15-120

This Project would provide the necessary infrastructure to support construction activity for the Plant Master Plan CIPs across the San José/Santa Clara Regional Wastewater Facility (Facility) site. It would include Facility access improvements, security, worker parking, contractor trailer and laydown areas, and future construction management space requirements.

The proposed project was analyzed for environmental impacts resulting from providing a construction staging area and was found to be adequately analyzed in all resource areas by the San José/Santa Clara Water Pollution Control Plan Master Plan Final Environmental Impact Report (PMP FEIR).

No new or more significant environmental impacts beyond those identified in the San José/Santa Clara Water Pollution Control Plan Master Plan Final Environmental Impact Report have been identified, nor have any new mitigation measures or alternatives which are considerably different from those analyzed in the PMP FEIR been identified. Therefore, an Addendum to the PMP FEIR is provided below.

Project Documents

Environmental Project Manager

Kieulan Pham
408-535-3844
Kieulan.pham@sanjoseca.gov

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Flash Player Download Flash Player Windows Media Player Download Windows Media Player Microsoft Silverlight Download Microsoft Silverlight Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer